Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T04PL00093

Parcel: 135102590

Inspection Status: Approved

Inspection History: PLUMBING - FINAL

Date Description Inspector Results Comments
01/22/2004 PLUMBING - FINAL Approved IVRS - Inspection 0000*/ 10 PSI PRESSURE TEST APPROVED FROM METER TO WTR HTR AND FURNACE. CORRECTIONS MADE.
01/20/2004 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection 0000*/ 1) UNION AT FURNACE SHALL BE LEFT AND RIGHT NIPPLE AND COUPLING OR BE PRECEEDED BY APPROVED VALVE IN ACCESSABLE LOCATION WITHIN 3' OF APPLIANCE. 2) VENTS FROM WATER HEATER AND FURNACE WITHIN 10' OF COOLER INTAKE TO BE 3' ABOVE COOLER. 3) GAS PIPING TO BE PROPERLY BONDED. 4) MAKE CORRECTIONS AND RETEST, CALL BACK FOR INSPECTION.