Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 01/16/2004 |
PLUMBING - GAS PRESSURE TEST |
|
Approved |
IVRS - Inspection 0000* |
| 01/15/2004 |
PLUMBING - GAS PRESSURE TEST |
|
Not ready for Inspection |
IVRS - Inspection 0000* |
| 01/14/2004 |
PLUMBING - GAS PRESSURE TEST |
|
Partial Approval |
IVRS - Inspection 0000*/ 1) 10 PSI PRESSURE TEST FROM METER TO WATER HEATER, STOVE, COOK TOP AND FURNACE-OK 2) ALL APPLIANCE JOINTS WITHIN 10' OF COOLER SHALL BE 3' ABOVE FOR TERMINATION 2) NO GAS FLEX SHALL PASS THRU A WALL OR PARTITION 3) ALL GAS PIPING SHALL BE INSTALLED AT ROOF PENETRATION. 10 PSI RETEST THIS SYSTEM. AFTER INSTALLATION OF ROOF JACK |