Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 01/12/2004 |
PLUMBING - FINAL |
|
Approved |
IVRS - Inspection 0000*/ 1) CORRECTIONS MADE OK. 2) OK FOR GAS. 3) UCC LEFT AT METER. |
| 01/09/2004 |
PLUMBING - FINAL |
|
Denied |
IVRS - Inspection 0999*/ ALL THREAD PROTECTORS ON THIS GAS LINE NEED TO BE REPLACED WITH APPROVED LISTED COUPLINGS. INSP. STOPPED. |
| 01/07/2004 |
PLUMBING - FINAL |
|
Denied |
IVRS - Inspection 0999*/ 1) ROOF PENETRATIONS REQUIRE AN APPROVED FLASHING. 2) WHERE UNIONS ARE REQUIRED, A RIGHT/ LEFT NIPPLE AND COUPLING SHALL BE USED. 3) ROOF TOP GAS TO BE STRAPPED AND SUPPORTED TO TABLE THREE - ONE, 94 UPC. 4) A GAS FLEX MAY NOT PASS THRU A WALL OR PARTITION. 5) GAS FLEX AT FURNACE UNDERSIZED. 6) HAVE THE PLBR CHECK HIS WORK BEFORE CALLING INSPECTION. |