Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 01/24/2005 |
PLUMBING - FINAL |
|
Approved |
IVRS - Inspection :* |
| 12/30/2004 |
PLUMBING - FINAL |
|
Not ready for Inspection |
COMPLETE ALL ITEMS |
| 11/09/2004 |
PLUMBING - FINAL |
|
Denied |
PROVIDE CORRECT DRAINAGE FOR HAND SINK ON WEST WALL AND HAVE ADDED TO YOUR PLANS. PROVIDE 1" MINIMUM AIR GAP @ ALL FLOOR SINK INDIRECT DRAINS TERMINATION. PROVIDE CORRECT DRAINAGE FOR (3) COMPARTMENT SINK & ELBOWS FOR FLOW CONTROL. PROVIDE CORRECT DRAWING FOR SINK THAT IS SHOWN AS HAND SINK ON PLAN. PROVIDE CORRECT 5" MIN FOR VACUUM BREAKER CRITICAL LEVEL FOR URINAL IN MENS' REST ROOM. PROVIDE BACKFLOW PROTECTION FOR WATER @ DRINK DISPENSER. PROVIDE VACUUM BREAKERS FOR EXTERIOR HOSE BIBS. CORRECTLY SUPPORT GAS PIPING ON ROOF & @ MOTOR. CAP ANY UNUSED GAS VALVES. PROVIDE CORRECT CLEANOUT COVER @ GREASE TRAP ON EXTERIOR. |