Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: SIGN SHOP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/05/2004 | SIGN SHOP | Not ready for Inspection | IVRS - Inspection :*/ 1) ANCHOR SIGN TO WALL 2) JUNCTION BOX TO HAVE COVER AND BE ACCESSIBLE 3) FINISH ITEM #1 LAST INSPECTION |
|
| 10/29/2004 | SIGN SHOP | Partial Approval | IVRS - Inspection :*/1)ISOLATE POWER TO SWITCH AS MARKED ON PLANS 2)SUPPORT GTO CABLE AS PER 600.32 1 1/2" AWAY FROM CABINET 3)CHECK GLASS AND GTO ON SITE - WILL NEED ACCESS | |
| 10/27/2004 | SIGN SHOP | Not ready for Inspection | IVRS - Inspection :*/SIGN NOT FINISHED-RECALL WHEN DONE |