Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T04OT00109
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/10/2004 | PLUMBING - FINAL | Approved | ||
02/06/2004 | PLUMBING - FINAL | Denied | IVRS - Inspection 0999*/ DOOR WAS LOCKED. | |
02/04/2004 | PLUMBING - FINAL | Denied | IVRS - Inspection 0999*/ 1) PUBLIC RESTROOM REQUIRES AN ELONGATED WTR CLOSET WITH OPEN FRONT SEAT. 2) T&P VALVE TEMP PROBE REQUIRES TO EXTEND 2" INTO WTR HTR VESSEL. 3) MUST REMOVE GALY TEE AND REMOVE EXISTING P-TRAP AND STAND PIPE. RE-CONNECT P-TRAP AND TRAP ARM FOR EXISTING SINK. | |
01/28/2004 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection 0000*/ 1) SECURE DRAFT HOOD AT WTR HEATER. 2) PROPER DRAINAGE FITTING REQUIRED AT LAV. 3) WTR SEAL ALL PLBG FIXTURES TO WALL OR FLOOR. 4) WTR HTR TEMPERATURE PRESSURE RELIEF NEEDS TO BE HARD PIPED AND SECURED PROPERLY. 5) GAS PIPING TO WTR HTR TO BE SECURED PROPERLY. |