Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/21/2004 | MECHANICAL - FINAL | Approved | IVRS - Inspection :*/ALL CORRECTIONS HAVE BEEN MADE | |
| 09/16/2004 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999*/PLEASE HAVE Y0UR CONTRACTOR RESCHEDULE AN INSPECTION WHEN SOMEONE WILL BE HOME. 1)PROVIDE SCREWS IN END CAPS ON WATER HEATER FLUE & SCREW TEE TO DOUBLE WALL PIPE. 2)REMOVE VALVE FROM SOFFIT AREA. WE WILL SOAP TEST THE FITTINGS |
|
| 09/10/2004 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) GAS LINE NOT HOLDING PRESSURE 2) REMOVE THE UNION FROM GAS LINE IN ATTIC AND USE REVESE THREAD COUPLING AND NIPPLE 3) EXTEND LOW COMBUSTION AIR DUCT TO WITHIN 12" OF FLOOR 4) SEAL JOINTS ON RETRUN AIR DUCT 5) DO NOT USE WHITE WIRE FOR LINE VOLTAGE 6) YOU CANNOT CUT THE COVER PLATE ON THE ELECTRIC PANEL. REPLACE THE COVER PLATE. USE THE KNOCKOUT PROVIDED ON THE SIDE OF THE PANEL. PROVIDE A PLUG IN THE HOLE CUT INTO THE SIDE OF THE PANEL. DO NOT USE AN EMT CONNECTOR INSIDE THE PANEL TO CONNECT THE LB. USE AND APPROVED FITTING. IDENTIFY THE CIRCUIT BREAKER. USE ONLY A MURRAY BREAKER IN THE ELECTRIC PANEL. RECALL FOR INSPECTION |