Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/28/2004 | MECHANICAL - FINAL | Approved | IVRS - Inspection :*/25 PSI TEST | |
| 09/21/2004 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999*/1)TERMINATE CONDENSATE TO WITHIN 6" OF THE GROUND. PROVIDE A ROOF JACK AT ELEC PENETRATION THRU THE ROOF & AT CONDENSATE DRAIN 2)SECURE THE ELEC DISCONNECT. DISCONNECT NOT ACCESSIBLE 3)PROVIDE A MIN. 10LB TEST ON NEW GAS PIPE 4)PROVIDE MIN 2 SCREWS IN ALL JOINTS OF VENT CONNECTOR INCLUDING DRAFT DIVERTER RECALL FOR INSPECTION |