Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
The login landing page when selecting 'View' is still occurring and is still pending further investigation.
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 04/21/2004 |
MECHANICAL - FINAL |
|
Approved |
IVRS - Inspection 0000*/ 1) 13 PSI TEST IS OK |
| 04/16/2004 |
MECHANICAL - FINAL |
|
Denied |
IVRS - Inspection 0999*/ 1) GAS LINE NEEDS TO BE COMPLETELY CONNECTED IN WATER HEATER ENCLOSURE AND RETESTED. DO NOT USE A UNION TO CONNECT PIPE . YOU CAN USE A REVESE THREAD COUPLING AND NIPPLE |
| 04/13/2004 |
MECHANICAL - FINAL |
|
Denied |
IVRS - Inspection 0999*/ 1) PROVIDE A MINIMUM 10 POUND PRESSURE TEST ON NEW GAS PIPE. YOU CAN INSTALL A SHUT OFF VALVE AT TOE IN WATER HEATER ROOM AND TEST ONLY THE NEW PIPE 2) PROVIDE A CHASE NIPPLE WHERE ELECTRIC WIRES PENETRATE THE CABINET OF A/C UNIT 3) PUT BLACK TAPE ON WHITE WIRES IN DISCONNECT AND CIRCUIT PANEL. IDENTIFY BREAKER FOR NEW EQUIPMENT 4) UNIT IS OVERFUSED AT 25 AMP. 20 AMP IS MAXIMUM 5) RELOCATE GAS PIPE AND ELECTRICAL CONDUIT FROM BLOCKING SERVICE ACCESS PANEL. MAINTAIN MINIMUM 6" ABOVE GRADE ON GAS PIPE 6) CORRECT AND RECALL FOR INSPECTION |