Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 01/09/2004 |
MECHANICAL - FINAL |
|
Approved |
IVRS - Inspection 0000*/ 14 PSI TEST IS OK. |
| 01/06/2004 |
MECHANICAL - FINAL |
|
Denied |
IVRS - Inspection 0999*/ 1) 3/8" I.D. GAS FLEX CONNECTOR NOT ADEQUATE FOR 125,000 BTU. VALVE MUST PROCEED GAS FLEX. 2) PROVIDE A PRESSURE TEST ON NEW GAS PIPING. 3) BLOCK AND CLAMP PVC ON ROOF EVERY 4'. PAINT EXPOSED PVC WITH LATEX PAINT. MUST TERMINATE WITHIN 6" OF GROUND. 4) SEAL ALL POP RIVETS AND INSULATION PIN HOLES ON EXPOSED DUCT ON ROOF AND ALSO SEAL S DRIVES BETTER. RECALL FOR INSPECTION. |