Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/11/2009 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 05/11/2009 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 04/15/2009 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 04/14/2009 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) BONDING NEEDS TO BE PUT BACK 2) NEED BREAKER FOR RIGHT SIZE WIRE AND LABEL 3) NEED 3' IN FRONT OF PANEL 4) NEED A/C SEAL TIGHT PUT BACK |
|
| 12/14/2004 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* OK TO CLEAR SERV. INC RESCHEDULE FINAL WHEN BRANCH CIRCUITRY IS COMPLETE 954-0161 USE ALL WEATHER PROOF FITTINGS & BOXES | |
| 12/10/2004 | ELECTRIC - FINAL | Denied | 1) SERVICE MUST HAVE A PERMANENT ADDRESS 2) RISER NOT SECURE, NEED A GROUND BUSHING WHERE RISER ENTERS BOTTOM OF SERVICE BECAUSE ENTRY IS MADE THRU CONCENTRIS-SEE #2 LAST INSPECTIONS 3) GROUND RODS TO BE 6' APART |
|
| 12/09/2004 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PANEL ALL IN ONE SHOULD BE ATTACHED DIRECTLY TO THE WALL (NOT 2 X 6) PLEASE REMOVE 2 X 6 AND ATTACH DIRECTLY TO MASONRY 2) INSTALL BOND BUSHING ON 2 1/2" RISER 3) SECURE RISER PER NEC TO MASONRY 4) INSTALL 2 GROUND RODS PER NEC ( MINIMUM 6' APART) AND BOND WATER AND GAS PIPES TO THE SERVICE 5) FINISH BRANCE CIRCUITING TO NEW PANEL OR CORDINATE AFTER THE CUT OVER IS COMPLETED BY TEP 6) LABEL ADDRESS TO METER BASE "6958" PER TEP |