Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T04EL01476
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/28/2004 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 07/27/2004 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245*/ 1) SERVICE TO HIGH FROM GROUND LEVEL A MAX HEIGHT OF 6'-7" TO HIGHEST BREAKER 2) GROUND RODS REQUIRED PER 250 NEC. 6' MINIMUM DISTANCE APART 3) BOND GAS PIPING 4) CHASE NIPPLE NOT ALLOWED AT 1" LB ON BOTTOM OF PANEL, MUST BE CLOSE NIPPLE WITH BONDING BUSHING 5) NO PROTECTION FOR CONDUCTORS PASSING THRU BACK OF ENCLOSURE |
|
| 07/22/2004 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245*/ 1) INSTALL LISTED J-BOX FOR SPLICES AT RIGHT OF SERVICE PANEL. USE PROPER CONNECTORS AND BUSHINGS 2) GROUNDING ELECTRODE CONDUCTOR MUST BE TIED IN TO SERVICE NEUTRAL BAR 3) INSTALL NEW GROUNDING SYSTEM OR VERIFY EXISTING IS INTACT 4) LABEL BREAKERS 5) WORK MUST BE DONE BY C-11 LICENSED CONTR. |
|
| 07/16/2004 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245*/ 1) ANCHOR SERVICE PANEL TO STRUCTURE, INSTALL PERMANENT LABLE ON COVER, MUST BE SCREWED OR RIVITED 2) SUPPORT CONDUIT 1" PER NEC. WITHIN 3' OF TERMINATION 3) REMOVE 3/4" SEAL TIGHT TIED BETWEEN SERVICES, NOT THAT THERE ARE 2 SERVICES ON BLDG 4) ID NEUTRAL WITH WHITE COLOR CODING TAPE |