Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: ELECTRIC - INTERMEDIATE
| Date |
Description |
Inspector |
Results |
Comments |
| 09/17/2004 |
ELECTRIC - INTERMEDIATE |
|
Approved |
IVRS - Inspection :* APPROVED AS PER PREVIOUS INSPECTION |
| 06/24/2004 |
ELECTRIC - INTERMEDIATE |
|
Not ready for Inspection |
IVRS - Inspection :*/ 1) LABEL BREAKERS AT SUB PANEL. 2) A MAIN BREAKER IS NEEDED INSIDE PANEL AS A 2ND STRUCTURE. 3) BOND GROUNDING ELECTRODE CONDUCTOR TO CONDUIT PER CODE. 4) ALSO NEED GROUNDING ELECTRODE SYSTEM AT 2ND STRUCTURE. 5) MULTIWIRE CIRCUIT ON SAME YOKE TO HAVE MANUFACTURERS TIE HANDLE. OK TO BACKFILL AND COVER TRENCH. |