Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/21/2004 | ELECTRIC - FINAL | Approved | IVRS - Inspection :*/WHERE IS THE GAS PIPING BONDED AT UNITS #1 & #2? | |
| 12/16/2004 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245*/1)GAS PIPING NOT BONDED AT APT #1 2)NEED TO VERIFY GAS & WATER BONDING AT ALL THERE UNITS. |
|
| 05/13/2004 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245*/ 1) A GROUNDING ELECTRODE SYSTEM IS REQUIRED FOR SEPERATE BLDGS PER 250-32 NEC. 2) INSTALL DISCONNECTING MEANS FOR WEST STRUCTURE PER 225-30 NEC. 3) GAS AND WTR PIPING TO BE BONDED ON ALL 3 DWELLINGS PER 250-104, 250-32 NEC. 4) GROUND J-BOXES, DO NOT USE SHEET METAL SCREWS. 5) WHAT WIRING ARE USED AT CONDUIT ENTRY INTO ATTIC? |