Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 04/15/2004 |
ELECTRIC - FINAL |
|
Approved |
IVRS - Inspection 0000* |
| 03/31/2004 |
ELECTRIC - FINAL |
|
Partial Approval |
IVRS - Inspection 0000*/ ELECTRICAL CONTRACTORS WORK IS COMPLETED. A PERMIT FOR NEW A/C IS NEEDED FOR RELEASE OF ELEC. POWER. |
| 03/23/2004 |
ELECTRIC - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) IF GROUNDING ELECTRODE CONDUCTOR IS ENCLOSED IT IS TO BE INSTALLED AS PER 250.64 ? BOND BOTH END OF RACEWAY 2) A/C DISCONNECT TO MAINTAIN CLEARANCE AND TIGHTEN LOOSE FITTINGS 3) PLEASE VERIFY NEW A/C PERMIT 4) GROUNDING ELECTRODE CONDUCTOR TO BE TERMINATED TO GROUNDED TERMINAL-ENCLOSURE CASE NOT TO BE PATH OF GROUND 5) TIGHTEN LOOSE FITTING AND RE-SUPPORT CONDUIT 6) USE AN APPROVED CONNECTOR FOR ALUMINIUM TO COPPER CONNECTION |