Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/01/2005 | ELECTRIC - FINAL | Approved | ||
| 01/20/2005 | ELECTRIC - FINAL | Denied | IVRS - Inspection : 1) INSTALL ROMEX CONNECTOR AT J-BOX, GROUND J-BOX 2) SEAL LB PENETRATION AT LB 3) WEATHERPROOF BOXES OUTSIDE, 1 SW, 1 J-BOX, 1 -LIGHT |
|
| 08/03/2004 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :*/ 1) NO WORK PRGORESS-MEET WITH ELECTRICAL CONTRACTOR RUBEN LUGO AND INSPECTIONS MANAGER STEVE LONG. MR. LONG OBSERVED ITEM FROM PREVIOUS INSPECTIONS AND SPOKE TIH MR. LUGO | |
| 04/09/2004 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection 0000*/ 1) ENTRANCES ABOVE CURRENT CARRING PARTS TO BE SEALED WITH AN APPROVED DEVICE 2) SECURE NM CABLES TO JUNCTION BOX 370.17 3) BOND JUNCTION BOX ENCLOSURE 250.148 4) CONTRACTOR STATES THAT CUSTOMER INSTALLED NON WEATHER PROOF BOX. THESE BOXES TO BE MADE WEATHER PROOF FOR FINAL INSPECTION CLEARANCE | |
| 03/16/2004 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection 0000* |