Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/20/2004 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 05/10/2004 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection : See detailed listing on site.| 999*/ 1) OK TO CLEAR SERVICE UPGRADE WILL NOTIFY TEP. CALL BACK FOR FINAL ONCE SERVICE ENERGIZED 2) INSTALL BRASS SCREW AT WATER BOND CLAMP ONE MISSING |
|
| 04/30/2004 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :*/ 1) PLAN SHOWS 1/0 COPPER TO WATER BOND NOT #4 (GAS ALSO) 2) RECALL WHEN CORRECTED AND WILL CLEAR | |
| 04/29/2004 | ELECTRIC - FINAL | Denied | IVRS - Inspection : There is no access to the site.| 920*/ 1) GATE LOCKED, STORE CLOSED. RECALL WHEN ACCESS AVAILABLE |
|
| 04/06/2004 | ELECTRIC - FINAL | Denied | IVRS - Inspection 0235* | |
| 03/05/2004 | ELECTRIC - FINAL | Denied | IVRS - Inspection 0210* BE ADVISED 1) THE PLAN MUST BE REVISED TO REFLECT THE AS BUILT SCHEME, PANEL LOAD CALC'S FOR ADDED PANEL ETC. 2) ART. 250 ( 51-94) REQUIRES ALL METAL PIPING ON THE PREMISES BE BONDED TO THE SERVICE GROUND. WHERE ARE WATER & GAS BONDS? 3) INSTALL FUSE REJECTION CLIPS & FUSES. 4) MARK EACH SWITCH AS DESIGNATED ON PLAN ( A, B, Z) 5) INTERIOR PANEL DIRECTORIES MUST BE COMPLETED. 6) MARK EACH SUB-PANEL PER PLAN DESIGNATION. CORRECT & RECALL. THANKS. WHERE IS GROUND BOND TO WATER PIPE? THE REVISED PLAN MUST BE REVIEWED AND STAMPED BY CITY PLANS REVIEWER LINDA BRESINSKY. HAVE STAMPED SET ON SITE FOR NEXT INSPECTION. |