Inspection History Details
Inspection Status: Compliance
Inspection History: INSP - FOLLOW UP CODE ENFORCE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/12/2005 | INSP - FOLLOW UP CODE ENFORCE | Compliance | VISITIED SITE, MET WITH OWNER ON FOLLOW UP INSPECTION FOR REMAINING VIOLATION NOT ABATED. #7 TC SEC 16-12A1, #2, ABATED - NEW KTICHEN ENTRY DOOR PRE-HUNG HAS BEEN INSTALLED. #8 TC 16-11J, ABATED - ALL NEW WINDOW CRANK HARDWARE HAS BEEN INSTALLED. #9 TC 16-11A-3, NEW SMOKE DETECTOR WERE INSTALLED IN ALL HABITABLE ROOM AND WERE REQUIRED BY DSD BUILDING INSPECTOR FOR COMBO PERMIT INSPECTION. #10 TC 16-11C 1, 2, #9 ABATED ALL 3 PRONG RECEPTACLE HAVE BEEN INSTALLED WITH EQUIPMENT GROUND UNDER COMBO PERMIT #T04CM04444 AND FINALED ON 1/11/05. #11 TC 16-11 F1,4 ABATED, BATHROOM WALL REPAIRED AND REFINISHED KITCHEN CABINET DRAWERS REPLACED AND REFINISHED. #12 TC 16-11B, H TC 16-13 E ABATED. RECITES FOR TERMITE DUST AND INTERIOR PEST CONTROL WRE PROVIDED. TERMITE INFESTED BASEBOARDS WERE REPLACED, NEW PREHUNG DOOR INSTALLED AND OLD EASING REMOVED. #13 TC 16-11 B, D ABATED, NEW WALL FURNACE WAS INSTALLED UNDER COMBO PERMIT TO4CM04444 AND WAS FINALED ON 1/11/05. #14 TC 16-11B3 ABATED, OWNER REPLACED ROOF OVERHANG. #15 TC 16-4 ABATED ILLEGALLY INSTALLED PORCH STRUCTURE HAS BEEN REPAIRED AND REINSTALLED UNDER COMBO PERMIT AND WAS FINALED ON 1/11/05. OWNER HAS COMPLIED WITH ALL ISSUES ON NOV AND INSTALLED NEW ENTRY DOORS FOR BEDROOMS. INSTALLED NEW FLOORING IN KTICHEN AND BATHROOM. THESE ITEM WERE NOT ON NOV. PICTURES WERE TAKEN. CLOSE CASE UNDER COMPLIANCE. |
|
| 11/16/2004 | INSP - FOLLOW UP CODE ENFORCE | Correction Required | VISITIED SITE ON FOLLOW UP INSPECTION. MET WITH OWNER WENT THROUGH ISSUES ON NOV DATED 10/05/04. 1. PLUMBING - ABATED NEW SINK AND CABINET HAS BEEN INSTALLED. 2. ABATED - CONTRACTOR - SUPER DRAIN ROOTER AND PLUMBERS LIC # ROC184075 PHONE # 623-4433 HAS COMPLETED REPAIRS TO SUPPLY LINE IN BATHROOM SHOWER. 3. ABATED - NEW TPR DRAIN VALVE INSTALLED. 4. ABATED - NEW CLEAN-OUT CAP INSTALLED. 5. ABATED - HOT WATER SHUT OFF REPAIRED. 6. ABATED NEW BOLTS TO CLOSET FLANGE AND TOILET BOWEL SEALED BUILDING AND STRUCTURE EXTERIOR SURFACES. 1. BROKEN WINDOWS REPLACED - ABATED. 2. NOT ABATED - NEW DOOR PRE-HUNG WILL BE INSTALLED SHOULD BE READY BY NEXT INSPECTION. 8. BUILDING INTERIOR ACCESS CONTROL. NOT ABATED - 80% COMPLETION, 2 MORE WINDOW CRANKS LEFT TO INSTALL. BUILDING INTERIORS FIRE SAFETY 9. ABATED NEW SMOKED DETECTOR INSTALLED AND WORKING ELECTRICAL SYSTEM 10. 1-ABATED - VIOLATION REMOVED 2- ABATED - NEW WEATHER PROOF BOX WITH WEATHER TIGHT FITTING. 3- ABATED -VIOLATION REMOVED. 4- ABATED - TREE BRANCHES HAVE BEEN TRIMMED TO ALLOW ROOM FOR ELECTRICAL CONDUCTORS FROM TEP POLE. 5- ABATED - NEW BLANK PLATES INSTALLED. 6- ABATED - VIOLATION REMOVED, NEW LIGHT FIXTURE INSTALLED. 7- ABATED - NEW RECEPTACLE INSTALLED - 2 PRONG 8- ABATED - NEW GFIC INSTALLED BY LIC. CONTRACTOR ENERGY SOURCE ELECTRIC INC. #ROC190818 L-11. 9- NOT ABATED - ALL BUT 2-RECEPTACLES ARE GROUNDED - OWNER WILL REMOVE 8 PRONG RECEPTACLE IN KITCHEN AND SOUTHWEST BEDROOM AND INSTALL 2-PRONG RECEPTACLE. 10- ABATED - VIOLATION REMOVED. INTERIOR SURFACES AND FIXTURES 11. 1 & 2 NOT ABATED - WORK IS ON GOING. FOUNDATION, WALLS AND ROOF - INTERIOR INSECT CONTROL. 12. ABATED BY HOME OWNER WILL SUPPLY COPY OF RECITE AND IS IN PROCESS OF REPLACING TERMITE DAMAGE MATERIALS. HEATING - MECHANICAL EQUIPMENT 13. NOT ABATED - NO GAS SERVICE AT THIS TIME, CONTACTOR IS SCHEDULED FOR REPAIRS AS SOON AS GAS SERVICE IS RESTORED. FOUNDATION WALL AND ROOF 14. NOT ABATED - WORK IS ON GOING AND SHOULD BE COMPLETED BY NEXT FOLLOW UP. PORCH STRUCTURE PERMITS REQUIRED. 15. NOT ABATED - PLANS ARE IN THE WORK. OWNER HAS MADE GOOD PROGRESS, STRUCTURE IS BEING REHABED INSIDE. STRUCTURE IS VACANT AND SECURED AT THIS TIME - 45 DAYS EXTENSION WILL BE GIVEN TO ABATED REMAINING VIOLATIONS. PICTURES WERE TAKEN. |