Inspection History: INSP - INITIAL CODE ENFORCMENT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/07/2004 | INSP - INITIAL CODE ENFORCMENT | Correction Required | 5/6/04, VISITED SITE, TOOK PICTURES, MET WITH MANAGER BARBRA, BARBRA DID HAVE ALL GATES LOCKED UP WHEN I ARRIVED AND HAS AGREED TO KEEP ALL ACCESSES SECURED UNITL CORRECTIONS HAS BEEN MADE, ALL READY HAS CONTACTED A CONTRACTOR TO START WITH REPAIRS, POOL AREA HAS 7 SEPERATE GATES LEADING INTO POOL AREA, ALSO THERE IS A STAIRWAY GOING TO SECOND LEVEL WITH WRONG SIZED FENCING INSTALLED ALSO WITH WRONG SIZED SPACING BETWEEN UPRIGHT BARS AND ALSO ON LANDING, 4 BARRIER GATES, DO NOT SELF CLOSE OR SELF LATCH, 3 SEPERATE UNIT PATIO GATES LEADING INTO POOL AREA, UNIT 106, HAS 3' GATE, OPENS INTO POOL AREA, THERE ARE SHRUBS (4') CONTAINING THE REST OF THE PATIO. THERE IS A 3' WOOD SLATTED FENCE SEPERATING THIS UNIT TO THE NEXT. ALL ISSUES ABOVE CONCERNING UNIT 106 WILL NEED CORRECTION. UNIT 110, UNIT HAS 5' FENCING AND GATE, GATE DOES NOT SELF CLOSE OR SELF LATCH, OPENS INTO POOL AREA, GATE LATCH IS ON WRONG SIDE OF GATE, ALL ABOVE NEEDS CORRECTION, UNIT 111, UNIT HAS 5' FENCING AND GATE, THIS GATE DOES SELF CLOSE AND SELF LATCHES, GATE OPENS INTO POOL AREA, AND LATCH IS ON WRONG SIDE OF GATE. NEEDS CORRECTION. STAIRWAY LEADING TO 2ND FLOOR ON SOUTH SIDE OF POOL, WROUGHT IRON RAILING WHICH ALL SO ACTS AS POOL BARRIER IS ONLY 3' IN HIGHT, SPACING ON RAILING IS OF WRONG SIZE, RAILING ON LANDING HAS 5' FENCING BUT ALSO HAS WRONG SIZE SPACING IN BETWEEN UPRIGHT BARS. MANAGER BARBRA STATED THAT ALL WOULD BE REPAIRED AND WOULD MAKE SURE ALL GATES STAY SECURED UNTIL CORRECTION HAS BEEN MADE, I EXPLAINED TO BARBRA THAT I WOULD FAX OVER N.O. NEXT MORNING SHE AGREED. I ALSO CALLED OWNER DAVID AND EXPLAINED WHAT I HAD FOUND HE ALSO STATED HE WOULD SEE REPAIRS WERE DONE AND WILL ALSO FAX OVER N.O. TO OWNER. FOLLOW UP 30 DAYS |