Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Case: T04DV00054

Parcel: 116124370


Addresses:

1408 W SONORA ST

Inspection Status: Compliance

Inspection History: INSP - FOLLOW UP CODE ENFORCE

Date Description Inspector Results Comments
08/31/2004 INSP - FOLLOW UP CODE ENFORCE Compliance VISITED SITE ON FOLLOW UP INSPECTION FOR UNIT #3 & 4.
UNIT 3 - NEW HARDWOOD FLOOR INSTALLED IN LIVINGROOM, NEW CERAMIC TILE IN KTICHEN AND BATHROOM. NEW KITCHEN CABINETS AND COUNTER TOP WERE INSTALLED HAZARDOUS ELECTRICAL BY DOOR, ELECTRICAL CONDUCTORS NOT IN CONDUIT WERE REMOVED.
UNIT 4 - CIELING HAS BEEN REPAIRED, REPAINTED AND TEXTURED THROUGHOUT UNIT. NEW CERAMIC TILE IN SHOWER STALL W/NEW FIXTURES. NEW VINYL FLOORING FOR BATHROOM INSTALLED.
COMMON AREA - NEW WROUGHT IRON FENCING WITH GATE HAS BEEN INSTALLED. OWNER HAS COMPLIED AND ABATED ALL VIOLATION. ELECTRICAL REPAIRS WERE DONE UNDER PERMIT AND ALL HAVE BEEN FINALED. PICTURES WERE TAKEN CLOSE CASE. PERMIT #T04EL00371 APPLIED, APPROVED, ISSUED AND FINALED ON 08/27/04
03/30/2004 INSP - FOLLOW UP CODE ENFORCE Partial Approval 80% OF VIOLATIONS ABATED
VISITED SITE ON FOLLOW UP INSPECTION, PRESENT WERE INSPECTOR II R.SALDATE & OWNER. ITEMS ABATED AS AS FOLLOWS.
(1) 16-11 (F2) NOT ABATED, TENNAT SCHEDULED TO MOVE TO UNIT 3 WHILE UNIT 4 IS BEING REHABED. OWNER STATED REHAB SHOULD BE COMPLETED WITH IN 30 DAYS.
(2) 16-12 (A1) ABATED, NEW PER-HUNG ENTRY DOOR, TRESHOLD & WROUGHT IRON SCREEN DOOR HAVE BEEN INSTALLED. ALL BROKEN WINDOW HAVE BEEN REPLACED.
(3) 16-11 (D) NOT ABATED, TENNAT SCHEDULED TO MOVE TO UNIT 3 WHILE UNIT 4 IS BEING REHABED. OWNER STATED REHAB SHOULD BE COMPLETED WITH IN 30 DAYS.
(4) 16-11 (F1,2&3)(G2) NOT ABATED, NEW CERAMIC TILE INSTALLED IN SHOWER STALL, FLOORING TO BE REPLACED AT SCHEDULED REHABED WITHIN 30 DAYS.
(5) 16-11 (C2) ABATED, ILLEGALLY SPLICED ELECTRICAL CORD HAS BEEN REPLACED.
(6) 16-11 (A 2&3) ABATED, SMOKE DETECTOR INSTALLED & OPERATIONAL.
(7) 16-12 (B2) NOT ABATED, TENNAT SCHEDULED TO MOVE TO UNIT 3 WHILE UNIT 4 IS BEING REHABED. OWNER STATED REHAB SHOULD BE COMPLETED WITH IN 30 DAYS.
(8) 16-12 (A2) ABATED, ALL DETERIORATED FASCIA HAS BEEN REMOVED NEW FASCIA INSTALLED & ALL EXPOSED SURFACES HAVE BEEN PAINTED.
(9) 16-12 (E) ABATED, NEW 6 FOOT CHAIN LINK FENCING HAS BEEN INSTALLED ALONG WITH GATE.
(10) 16-13 (A 1,2&3 B) ABATED, ALL UNTENTED VEGETATION HAS BEEN REMOVE ALONG WITH ACCUMULATED CONSTRUCTION DEBRIS.
03/17/2004 INSP - FOLLOW UP CODE ENFORCE Approved VISTED SITE ON FOLLOW-UP INSPECTION. ALL DETERIORATED FASCIA BOARD HAS BEEN REPLACED. NEW ROOF WITH DRIP EDGE FOR ALL COMPLEX. EXPOSED BLOCK AND BEEN PREP AND REPAINTED. ALL UNITS HAVE HAD NEW ENTRY DOOR INSTALLED WITH WROUGHT IRON SCREEN DORS. NEW CHAIN LINK FENCING HAS BEEN INSTALLED IN FRONTYARD AND BACKYARD. ALL ACCUMULATED CONSTRUCTION TRASH & DEBRIS HAS BEEN REMIVED FROM BACKYARD. FKUE VENT FOR WATER HEATER #2 & 3 HAS BEEN PRIPERLY REINSTALLED WITH T.P.R. DRAIN. ALL BROKEN WINDOWS HAVEN BEEN REPLACED. NEW SUB-PANEL INSTALLED WILL CHECK FOR PERMITS & WILL CALL AND SCHEDULE REINSPECTION FOR INTERIOR. NEW OWNER WAS ATTEMPTED TO BE REACHED NO ANSWER, LEFT MESSAGE FOR RETURN CALL AND SCHEDULED FOR INSPECTION OF INTERIOR FOR REMAINING VIOLATIONS. PICTURES WERE TAKEN.