Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Case: T04DV00011

Parcel: 12701003S


Addresses:

250 N ARCADIA AV


Inspection Status: Compliance

Inspection History: INSP - FOLLOW UP CODE ENFORCE

Case Number - T04DV00011

Inspection Description - INSP - FOLLOW UP CODE ENFORCE

Inspection Status - Compliance

Date Description Inspector Results Comments
03/15/2004 INSP - FOLLOW UP CODE ENFORCE Compliance VIOLATIONS ABATED
VISITED SITE ON FOLLOW UP INSP. MADE CONTACT WITH MAINTAINANCE SUPERVISOR, INSPECTED REPAIRS TO POOL PUMP PLUMBING. LEAKING ELBOW FITTING HAS BEEN REPAIRED. PREVIOUS INSPECTION ON 3/9/04 FOUND ALL OTHER VIOLATION ABATED. CONVERSATION WITH MAINTAINANCE SUPERVISOR & MANAGER INFORMED ME TWO ADDTIONAL HOT WATER HOLDING TANKS ARE SCHEDULED TO BE INSTALLED STARTING THE 19TH OF MARCH OF 04. THIS INSTALLATION WILL SLOVE PROBLEM OF TIME LAG OF HOT WATER USE DURING PEAK HOUR USAGE. PICTURE WAS TAKEN. MANAGEMENT HAS COMPLIED, CLOSE CASE
03/09/2004 INSP - FOLLOW UP CODE ENFORCE Correction Required VISITED SITE ON REQUESTED FOLLOW UP, MADE CONTACT WITH MAINTENANCE SUPERVISOR JOSE CHECKED PUMP STATION LEAKS AT COUPLINGS HAVE BEEN REPAIRED BUT DUE TO WATER ON FLOOR WAS UNABLE TO DETECT LEAK FROM PVC COMING UP FROM UNDER NEIGHBORS CONCRETE SLAB. SUPERVISOR WILL ATTEMPT TO HAVE REPAIRS DONE WITH IN THE WEEK AND WILL CONTACT INSP WHEN COMPLETED. CONTRACTOR MAY HAVE TO BE CONTACTED. DO FOLLOW UP IN 30 DAYS. PICTURES WERE TAKEN.

VISITED SITE ON FOLLOW INSP. WALKED PROPERTY WITH MAINTENANCE SUPERVISION JOSE.
#1 - NEW WEATHER PROOF ENCLOSURE HAS BEEN INSTALLED AT JUNCTION BOX. VIOLATION ABATED.

#2 - NEW WEATHERPROOF ENCLOSURE HAS BEEN INSTALLED VIOLATION ABATED.

#3 - ELECTRICAL CONDUCT OR HAVE BEEN RE-INSTALLED INTO CONDUIT. CONDUIT HAS BEEN RESECURED TO WALL. JUNCTION BOX COVER HAS BEEN REPLACED. VIOLATION ABATED.

#4 - COVER PLATE HAS BEEN INSTALLED AN ELBOW FITTING VIOLATION ABATED.

#5 - ALL OPENING LARGER THAN 4" HAVE BEEN REPAIRED AND REPAINTED VIOLATION ABATED.

#6 - NOT ABATED.

#7 - RE-ROUTING OF COMPLEX WATER LINES WERE PERMITTED, INSPECTED AND FINALED BY DSD. COPIES OF PERMITS AND FINALS ARE ATTACHED TO INSPECTION REPORT AND IN PACKET. WILL DO FOLLOW UP IN 30 DAYS FOR REMAINING UNABATED VIOLATION ON #6. MAINTENANCE SUPERVISOR STATED REPAIRS TO FLANGE LEAKING AT PUMP STATION WILL BE REPAIRED WITHIN THE WEEK. WILL CONTACT INSP LOPEZ WHEN COMPELTED. PICTURES WERE TAKEN.