Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/01/2005 | FRAMING | Approved | IVRS - Inspection :* | |
| 05/31/2005 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) GARAGE P-3 REQUIRE A.B.'S AT 16" ON CENTER 2) TUB TRAP VENT NOT CONNECTED 3) SEAL FLOOR PENETRATIONS 4) TRUSSES NOT SHIMMED 5) ANCHOR BOLTS REQUIRD WITHIN 12" OF SPLICES |
|
| 05/27/2005 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) LVL REQUIRES TWO U.24 HANGERS 2) GARAGE SHEAR REQUIRES A.B.'S AT 16" ON CENTER 3) SEAL BETWEEN FLOORS 4) SHIM F3 TRUSS AND F5 5) A.B. REQUIRED WITHIN 12" OF SPLICE 6) NO GAS TEST 7) NAIL P1 SHEARWALL SILL AT 12" ON CENTER 8) SECURE TUB MIXER 9) NAIL GARAGE P3 AT 3" ON CENTER |