Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/29/2006 | ENGINEERING - FINAL | Approved | Contractor completed punch list. | |
| 11/14/2006 | ENGINEERING - FINAL | Denied | Contractor needs to: 1- Have all changes to approved drawing addressed at 201 N. Stone. 2- Install trucated domes in HC area. 3- Remove dumpster, port-a-potty and sand from staging area. 4- Stabilize westside of paking area. (rear of building) 5- Install wheel stops. |