Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/05/2005 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :*SADDLE TEE LISTING IS OK | |
| 07/05/2005 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 2 1/2" H20 T/K STUBBED UP & 3' OUT OF NORTH WEST CORNER PRESSURE TEST OK. 1) WILL NEED TO VIEW CONNECTION TO YARD WATER PIPING. 2) SEE NOTE #2 FROM 6/27/05 INSPECTION. | |
| 06/27/2005 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* GREASE WASTE WATER TEST TO 2-WAY CLEANOUT OK UNDERGROUND ONLY. SANITARY WASTE TEST TO 2 -WAY CLEANOUT UNDERGROUND ONLY CORRETION MADE. 1) 2 1/2 H20 SERVICE REQUIRES TYPE K COPPER PER YOUR SPEC. PLEASE INSTALL & CALL BACK IN FOR INSPECTION. 2) PIPE WRAPS WILL NEED TO BE VIEWED PRIOR TO CONCRETE. | |
| 06/22/2005 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) WATER TEST 3" GREASE WASTE FROM INSIDE BLDG TO 2-WAY CLEANOUT (PARTIAL APPROVAL) 2) CORRECT HORIZONTAL VENT AT FD-1 ON GREASE WASTE AT 3-COMP SINK 3) PLEASE PROVIDE SPEC BOOK FOR TYPE OF MATERIAL PER SECTION 15100 4) CORRECT BACK PITCHED SECTION OF 3" SANITARY DRAIN PRIOR TO FS-4 ON SOUTH END 5) PROVIDE 10' HEAD WATER TEST ON SANITARY SYSTEM 6) 2 1/2 COPPER H20 SERVICE STUB OUT AND UP AT NORTH WEST CORNER 100 PSI AIR TEST (PARTIAL) PENDING VERIFICATION OF MATERIAL TYPE FROM SPEC BOOK 7) PROVIDE GOOD SHADE MATERIAL AND BACKFILL MATERIAL WITH NO BRIDGING |