Permit: T04CM05219

Parcel: 13317062A

Inspection Status: Approved

Inspection History: ELECTRIC - FINAL

Permit Number - T04CM05219

Inspection Description - ELECTRIC - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
04/18/2005 ELECTRIC - FINAL Approved IVRS - Inspection :*
04/11/2005 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*MEET WITH ETL REP-TESTING IS IN PROGRESS
04/05/2005 ELECTRIC - FINAL Partial Approval IVRS - Inspection :* OK TEMP C OF O SUBJECT TO BOND. 1) WAITING ON LISTING FOR EC UNITS
04/04/2005 ELECTRIC - FINAL Not ready for Inspection IVRS - Inspection :* 1) ETL LABELS HAVE BEEN ?? INSTALL BY TUCSON TRAIN NOT ETL. THIS IS FOR EVAP COOLERS. PROVIDE VERIFICATION FROM ETL FOR THIS PROCEDURE. 2) WE HAVE MULTIPLE TERMINATION AT GROUND LUGS. DOES MC ??? APPROVED THIS METHOD OF GROUNDING. 3) TIGHTEN FLEX CONNECTION AND PROVIDE BOND BUSHINGS AS DISCUSSED.
03/14/2005 ELECTRIC - FINAL Partial Approval IVRS - Inspection :* 1) FINISH PREVIOUS ITEMS. 2) WORK NOT A?? TO EQUIPMENT IS COMPLETE.
03/10/2005 ELECTRIC - FINAL Not ready for Inspection IVRS - Inspection :* NOT READY. 1) PLEASE VERIFY LISTING FOR FITTING USED WITH PVC COATED M/C CABLE. USE APPROVED FITTING FOR WIRING METHODS PER 110.3 & 517.13. 2) CLEAN SURFACE UNDER GROUND LUGS. 3) FILL UNUSED OPENING FOR GROUND WIRE. 4) PLEASE VERIFY LISTING AND LABELING PER 110.3 AMRI UNITS, ROOF EC-1 & EC-2, AMRI POWER CONVERTERS. 5) PLEASE REPLACE MISSING COVERS AND FILL UNUSED OPENINGS IN PANELS