Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/23/2005 | FRAMING | Approved | IVRS - Inspection :* | |
| 06/20/2005 | FRAMING | Partial Approval | IVRS - Inspection :* 1) INSTALL 2-WAY CLEANOUT AT BLDG 2) 2 RAFTERS OVER DRILLED FOR 1 1/2" VENT 3) BLOCK ALL MECH 3-SIDES 4) BANG PLATES MISSING 5) OK TO COVER ALL OF SEWER, EXCEPT AT CLEANOUT LOCATION 6) INSTALL LONG SISTER 2 X 8 TO CUT RAFTERS STAGGER NAILS AT 6" ON CENTER (9 1/2' LONG SCABS |