Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T04CM05144
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/21/2007 | ENGINEERING - FINAL | Approved | PICKED UP AS BUILT AND REVIEWED TO VERIFY MATCHED SITE | |
03/09/2007 | ENGINEERING - FINAL | Partial Approval | MET AND WALKED SITE WITH NICK PAPANIKOLAS (DIVERSIFIED) -BASIN CERTIFICATION WAS NOT RECEIVED (ITEM 6 2/28 INSP) -RECEIVED "AS-BUILT" FOR BLEEDER PIPE ON NW RETENTION/DETENTION BASIN -AS-BUILT FOR ENTIRE SITE NOT RECEIVED-CALLED STEVE CORRALES TO REQUEST -SPLASH BLOCKS NEED TO BE PLACED AT EACH DOWN SPOUT LOCATION -SITE NEEDS TO BE SWEPT-SWEEPER DUE MON/TUES PER NICK -PORTA TOILETS NEED TO BE REMOVED-NICK CALLED WHILE I WAS ON SITE TOOK PLANS TO ELIZABETH DOWNTOWN TO DISCUSS AS-BUILTING REQ'MTS |
|
03/02/2007 | ENGINEERING - FINAL | Denied | Contractor needs to complete punch list from 2/28/07. | |
02/28/2007 | ENGINEERING - FINAL | Denied | 1) COMPLETE SITE WORK PER APPROVED PLAN. 2) COMPLETE LANDSCAPING PER APPROVED PLAN. 3) SEPARATE CONSTRUCTION ACTIVITY FROM PUBLIC ACCESS. 4) PROVIDE SAFE UNOBSTRUCTED/ADA COMPLIANT ACCESS FOR OCCUPANTS. 5) COMPLETE RET/DET BASIN. 6) PROVIDE BASIN CERT. STATEMENT FROM THE ENGINEER OF RECORD. 7) PROVIDE AN AS- BUILT PLAN FOR FINAL GRADING INSPECTION. |
|
06/20/2005 | ENGINEERING - FINAL | Prior to Final Inspectn | Assure that drainage within the loading / dumpster area is directed toward the basin, not drainageway to the north. |