Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 01/04/2005 |
PLUMBING - ROUGH, SOIL |
|
Approved |
IVRS - Inspection :* |
| 12/30/2004 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection :*/REPAIR LEAK AT 4X3 COMBO AT TRANSITION BAND BELOW LAV AND CALL IN FOR INSPECTION PRIOR TO CONCFRETE. |
| 12/29/2004 |
PLUMBING - ROUGH, SOIL |
|
Not ready for Inspection |
IVRS - Inspection :*/1)NOT INSTALLED PER PLAN. NO TEST ON SYSTEM. SANTEE MAY NOT LAY ON ITS BACK. A FURNCO IS NOT APPROVED UNDER THE BLDG. PIPING TO BE SUPPORTED TO TABLE 3-1 94 UPC. UNABLE TO SEE OVER HEAD. 2)PENCILED IN CHANGES NOT ACCEPTED. INSPECTION STOPPED. |
| 12/23/2004 |
PLUMBING - ROUGH, SOIL |
|
Not ready for Inspection |
IVRS - Inspection :* |