Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - ABOVE CEILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/01/2005 | MECHANICAL - ABOVE CEILING | Approved | IVRS - Inspection :* 1) OK FOR CEILING TILES 2) SECONDARY DRAINS WILL BE REQUIRED AS PER PLANS |
|
| 08/30/2005 | MECHANICAL - ABOVE CEILING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) STRAPS ON FLEX DUCTS MUST BE MINIMUM 1 1/2" WIDE HANGER STRAP 2) SEE NOTES FROM PREVIOUS INSPECTION. MECHANICAL CONTRACTOR PLEASE READ THE PLANS AND SPECS PRIOR TO PROCEEDING |
|
| 08/26/2005 | MECHANICAL - ABOVE CEILING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) ON FINAL PERMANENTLY IDENTIFY EQUIPMENT 2) STRAP ON SUPPORT FLEX DUCTS FROM BATHROOM EXHAUST AND STRAP UP FLEX DUCTS LAYING ON GRID AND TILES. INSULATE ALL SPIRAL PIPE IN CEILING SPACE AND T WYES. SUPPORT REFER LINES IN MECHANICAL ROOM. FLEX DUCT BLOCKING ACCCESS TO FC 1. PROVIDE A PLATFORM ABOVE THE HARD DUCT TO SERVICE FC1. PLANS CALL FOR SECONDARY DRAIN PANS UNDER FAN COILS |
|
| 07/21/2005 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* 1) CONDENSATE PIPING, SUSPENDED COPPER TO AIR HANDLER LOCATIONS, DOWN TO FLOOR SINK |