Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T04CM05006
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/14/2005 | ENGINEERING - FINAL | Approved | PER INSP FORM | |
06/10/2005 | ENGINEERING - FINAL | Partial Approval | SITE IS NOT READY FOR A FINAL C OF O. ROCK-RIP-RAP NEEDS TOB ADDED TO THE OUTFLOW INTO THE DETENTION RETENTION BASIN LOCATED TO THE WEST OF THE PROJECT. tHE NORTH PARIMETER NEEDS TO BE LEVELED FLAT WITH CLEAN UP OF LARGE ROCKS. |