Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/20/2006 | ENGINEERING - FINAL | Approved | ||
| 12/23/2005 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O FOR ENGINEERING ONLY, CALL FOR RE-INSPECTION WHEN SITE WORK IS 100% COMPLETED. | |
| 12/20/2005 | ENGINEERING - FINAL | Denied | IN ORDER TO OBTAIN PARTIAL APPROVAL FROM ENGINEERING FOR A TEMPORARY C OF O, THE FOLLOWING ITEMS MUST BE COMPLETED: 1) PROVIDE AN UNOBSTRUCTED PEDESTRIAN CIRRCULATION PATH FROM THE BLDG TO THE RIGHT OF WAY. 2) SEPARATE CONSTRUCTION ACTIVITY FROM THE PUBLIC (BARRICADES, SIGNAGE, FENCING ECT.) 3) INSTALL HC SIGNS FOR HC PARKING SPOTS. 4) REMOVE SCAFFOLDING TO ALLOW SAFE INGRESS AND EGRESS. 5) PROVIDE AN UNOBSTRUCTED ACCESS TO TRASH DUMPSTER. A TEMP C OF O WILL EXPIRE IN 90 DAYS, A RE-INSPECTION IS REQUIRED FOR A PERMANENT C OF O PRIOR TO EXIRATION. |