Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
Permit Number - T04CM04985
Inspection Description - BUILDING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/03/2005 | BUILDING - FINAL | Approved | IVRS - Inspection :* | |
04/25/2005 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) #2 NOT DONE 2) DOWN SPOUT NEEDED AT SERV. 3) NEED AIR ADMITTANCE VALVE AT KITCHEN PER PLAN, OR WAS VTR INSTALLED |
|
04/21/2005 | BUILDING - FINAL | Partial Approval | IVRS - Inspection :* 1) 90 DEGREE ELBOW ON CONDENSATE 2) DEAD SHORT IN BED 3 AND 4 CIRCUIT ARC/FAULT WON'T REST 3) LOOSE DEVICE LEFT OF KITCHEN SINK (ELECTRIC) 4) LOCATE MAKE-UP AIR DUCT RAISE VTR WHERE NECESSARY |