Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: REINFORCED MASONRY PRE-GROUT
Permit Number - T04CM04885
Inspection Description - REINFORCED MASONRY PRE-GROUT
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/02/2005 | REINFORCED MASONRY PRE-GROUT | Approved | TOP OF STAIR N OF RAMP OK | |
| 04/22/2005 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* PARTIAL | |
| 04/19/2005 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1ST LEVEL A.8/6-7 8'; STAIR AJ C IP RETAIN WALL OK. | |
| 04/15/2005 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* RAMP WALLS GROUTED-BOND BEAN & TOP TO BE SLUGGED IN. | |
| 04/14/2005 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :*TOP OUT @ SHOP OK ( LESS OPENING) | |
| 04/13/2005 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* YOU NEED BOND BEAM TOP OF RAMP WALLS. WF1 FOOTING NORTH OF RAMP NOT LAYERED OUT PROPERLY | |
| 04/12/2005 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* | |
| 04/11/2005 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* | |
| 04/08/2005 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* | |
| 04/07/2005 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* STEM BY ELEVATOR A.8/G-7 | |
| 04/06/2005 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 8' SHARP PERIMETER NOTE: PER GSN MISSING MCJ @ CENTER OF SOUTH WALL. PROVIDE RFI. | |
| 04/05/2005 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* LIFT@RAMP SIDES TO HIGH POINT SLAB | |
| 04/04/2005 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* RAMP WALLS WATER PROTECTED. OK TO BACKFILL TO 1ST BOND BEAM. | |
| 04/01/2005 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* PROGRESS NO COMPLETE LIFT | |
| 03/31/2005 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* OK RAMP WALL TO 1ST BOND BEAM | |
| 03/30/2005 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | IVRS - Inspection :* | |
| 03/29/2005 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* STEMS 12"@ RAMP AND 4'LIFT @ SHOP | |
| 03/28/2005 | REINFORCED MASONRY PRE-GROUT | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NO INSPECTIONS WERE EVER CALLED FOR FOOTINGS OR FOUNDATIONS. I CANNOT APPROVE WORK ATTACHED TO AND DEPENDING ON NON APPROVED WORK. 2) CONTRACTOR STATES THAT THEY WERE TOLD BY TRANSPORTATION DEPT PHIL SABIN & CHIS LEIGHTON THAT THEY WERE ONLY GOING TO HAVE SPECIAL INSPECTION AND NOT DSD. |