Permit: T04CM04804

Parcel: 12907006S


Addresses:

1563 E 36TH ST

Inspection Status: Approved

Inspection History: PLUMBING - ROUGH, SOIL

Date Description Inspector Results Comments
06/28/2005 PLUMBING - ROUGH, SOIL Approved IVRS - Inspection :* 1) ALL DWV RISERS HAVE BEEN WRAPED. 2) OK FOR CONCRETE.
06/13/2005 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :* SCH40 4" BUILDING DRAIN CONNECTION TO 4" SAR 35 BUILDING SEWER AT SOUTH CENTER OF BUILDING OK
06/09/2005 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1) CONNECTION OF 4" BLDG DRAIN TO 4" BLDG SEWER
2) 4" PVC DWV TO 4" SDR 35 SOUTH EAST END WOMENS RESTROOM OK
06/07/2005 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
06/01/2005 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :* 1) SOIL WATER TEST IS OK. 2) NOTE: P-5 FLOOR DRAIN IN WOMENS RESTROOM SHALL HAVE A MIN OF 2X THE PIPE DIAMETER FOR MIN. TRAP ARM DISTANCE. 3) SHALL PROVIDE AN APPROVED TRANSITION COUPLING WHERE BLDG. SEWER CONNECTS TO SITE SEWER. FERNCO COUPLINGS ARE CONSIDERED A REPAIR COUPLING AND ARE NOT ACCEPTED IN A NEW APPLICATION. 4) OK TO BACKFILL THE TRENCH UP TO THESE AREAS AND PROVIDE A WATER TEST FOR WOMENS RESTROOM ONLY.