Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T04CM04795
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/11/2005 | ENGINEERING - FINAL | Approved | ||
| 10/10/2005 | ENGINEERING - FINAL | Approved | ||
| 09/16/2005 | ENGINEERING - FINAL | Partial Approval | 1. PROVIDE DRAINAGE THRU THE CURB ON WEST SIDE OF BLDG. 2. PROVIDE ROCK RIP RAP ON THE RETENTION BASIN SLOPES AND AT ALL CURB OPENINGS. 3. PROVIDE BARRICADE RAILING BETWEEN THE SIDEWALK AND THE SOUTH BANK OF THE RETENTION BASIN. 4. CONSTRUCT TRASH ENCLOSURE TO C.O.T DEVELOPMENT STANDARD OR OBTAIN APPROVAL LETTER FROM ENVIRONMENTAL SERVICES FOR ALTERNATE CONSTRUCTION. 5. CLEAN UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS THAT HAS BEEN DEPOSITED ON LOTS 1 AND 3. 6. RE-SEED THE AREAS ON LOTS 1 AND 3 THAT WERE IMPACTED BY THE CONSTRUCTION ON THIS SITE. 7. PROVIDE A WALL OPENING FOR DRAINAGE IN THE SOUTH WALL OF THE AC UNIT ENCLOSURE. |
|
| 09/15/2005 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O FOR STOCKING PURPOSES AND TRAINING OF BANK PERSONNEL ONLY. INSPECTOR WILL PROVIDE A PUNCH LIST OF INCOMPLETE ITEMS ON FRIDAY 9-16-05. |
|
| 09/14/2005 | ENGINEERING - FINAL | Denied | NOT READY, COMPLETE SITE WORK. SEE PREVIOUS INSPECTION NOTES. |
|
| 09/13/2005 | ENGINEERING - FINAL | Denied | MEETING WITH RANDY PAOLETTI/FINA CORP. AND DAN CORCORAN/BANK ONE TO DISCUSS C OF O REQUIREMENTS. | |
| 09/12/2005 | ENGINEERING - FINAL | Denied | 1. COMPLETE ALL SITE WORK AS SHOWN ON THE SITE PLAN. 2. FINISH GRADES INCLUDING BACKFILL ON IRRIGATION TRENCHES AND PLANTING HOLES. 3. CLEAN-UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS. |