Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T04CM04755

Parcel: 13322471B


Addresses:

7225 E BROADWAY BL

Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Date Description Inspector Results Comments
05/25/2006 ENGINEERING - FINAL Approved
03/31/2006 ENGINEERING - FINAL Partial Approval TEMPORARY C OF O APPROVED
PERMANENT C OF O NOT TO BE GIVEN UNTIL THE FINAL GRADING INSPECTION IS APPROVED.

CONTACT CRAIG GROSS 9791-5550) REGARDING POSTING A BOND FOR A TEMPORARY CEERTIFICATE OF OCCUPANCY, IN LIEU OF COMPLETION OF THE FOLLOWING PUNCHLIST ITEMS:

1. SUBMIT A REVISED GRADING PLAN TO THE CITY OF TUCSON DEVELOPMENT SERVICES ENGINEERING DIVISION FOR REVIEW AND APPROVAL.
2. PROVIDE REVISIONS FOR DETAILS A, B & C THAT CORRECT THE ELEVATION DISCREPANCIES (2589 PROPOSED Vs 2587 AS-BUILT). ALSO PLEASE SHOW: THE CORRECT LINEAR FEET FOR THE LOW-FLOW PIPE ON DETAIL A, SHOW THE WSEL AND SPILLWAY ELEVATIONS ON DETAIL B, SHOW THE EXISTING WALL, PROPERTY LINE AND DRAINAGE SWALE ON DETAIL C.
3. PROVIDE 12" OF REVEAL CURB ON THE RETENTION BASIN SPILLWAY AS SHOWN ON DETAIL B. MATCH THE BASIN BERM TO TOP OF CURB.
4. COMPLETE THE SITE WALL CONSTRUCTION AT THE NORTHEAST CORNER OF THE PROJECT. PROVIDE AN ENGINEERED DETAIL FOR THE WALL DRAINAGE OPENING AT THE NORTHEAST CORNER OF THE SITE. THE EXISTING WALL OPENING WAS DESTROYED DURING CONSTRUCTION. SUBMIT THE DETAIL OF THE OPENING FOR REVIEW AND APPROVAL BY THE C.O.T. ENGINEERING DIVISION. THE WALL OPENING MUST BE DESIGNED TO ACCOMMODATE THE FLOW FROM THIS SITE.
5. ADDRESS THE EXISTING SITE WALL DRAINAGE OPENING NEAR THE NORTHWEST CORNER OF THE SITE. THIS OPENING IS NOT SHOWN ON THE GRADING PLAN. STORMWATER RUN-OFF THROUGH THIS OPENING CAUSES FLOODING OF THE ADJACENT RESIDENTIAL PROPERTIES DURING HEAVY RAINFALL EVENTS.
6. PROVIDE POSITIVE DRAINAGE ON THE NORTH PERIMETER OF THE SITE. THE ROCK RIPRAP IS HIGH AND CAUSES PONDING WATER ON THE ADJACENT PROPERTY.
7. SHOW THE CORRECT TRASH ENCLOSURE DIMENSIONS ON THE REVISED PLAN.
8. PROVIDE A LETTER OF CERTIFICATION FROM AN ARIZONA REGISTERED PROFESSIONAL ENGINEER THAT CERTIFIES THAT THE PROJECT, DRAINAGE WAYS, AND THE RETENTION/DETENTION BASIN ARE CONSTRUCTED IN SUBSTANTIAL CONFORMANCE WITH THE APPROVED PLAN AND WILL FUNCTION AS DESIGNED.
9. PROVIDE BICYCLE PARKING LOCKERS AS SHOWN ON THE PLAN.