Inspection History Details
Inspection Status: Approved
Inspection History: SITE - SEWER
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/16/2006 | SITE - SEWER | Approved | IVRS - Inspection :* | |
| 02/07/2006 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 1) SITE SEWER WATER TEST TO NEW PUBLIC MAN HOLE 15 OK 2) NEED TO SEE TERMINATION OF IN LINE CLEANOUTS 3) CALL IN ALL PLUMBING INSPECTIONS THAT HAVE NOT BEEN APPROVED |
|
| 01/26/2006 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 1) 6" SDR 35 SEWER FROM ASPHALT NORTH THEN EAST APPR. 25' UP STREAM OF NEW MAN HOLE WATER TEST OK |
|
| 01/25/2006 | SITE - SEWER | Partial Approval | IVRS - Inspection :* WATER TEST 6" SDR 35 FROM ASPHALT TO 15' FROM LAST INCLINE CLEANOUT PRIOR TO MANHOLE. 1. PROVIDE TRACER WIRE 2. USE DIRECTIONAL FITTING AT CORNER FROM NORTH TO EAST RUN & RE TEST |
|
| 12/21/2005 | SITE - SEWER | Partial Approval | IVRS - Inspection :*TWO WAY C.O HAS BEEN INSTALLED @ ALL BLDG DRAIN STUBB OUTS OK TO BACKFILL TRENCH. |
|
| 12/20/2005 | SITE - SEWER | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. SHALL PROVIDE DIRECTIONAL FITTING FOR ALL TWO WAY C.O. WHERE BUILDING DRAIN CONNECTS TO BLDG. SEWER 2. DO NOT COVER |
|
| 12/19/2005 | SITE - SEWER | Partial Approval | IVRS - Inspection :*SOIL WATE TEST IS OK NOTE: BLDG SEWER IS OK FROM TWO WAY C.O LOCATION TO OUTSIDE OF NORTH PARKING LOT INTO DRAINAGE AREA AS INITIALED ON PLAN. SHALL PROVIDE DIRECTIONAL FITTINGS FOR TWO WAY C.O. @ BLDG DO NOT USE FERNCO COUPLINGS |
|
| 12/16/2005 | SITE - SEWER | Not ready for Inspection | IVRS - Inspection :* |