Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 12/10/2004 |
PLUMBING - ROUGH, SOIL |
|
Approved |
IVRS - Inspection :*/1)NOT INSTALLED PER PLAN. NO REDLINES ON SITE. 2)CONTRACTOR TO REDLINE AS BUILTS AS TO ALL CHANGES 3)CONTRACTOR TO VOMPLETE ALL DEMO/INSTALL KEYNOTES OR PROVIDE REVISED PLAN/ARCHETECT LETTER FOR CHANTE. 4)BLACKLINE CHANGES TO PLAN NOT APPROVED FOR ENGINEERING CHANGES. |
| 12/09/2004 |
PLUMBING - ROUGH, SOIL |
|
Not ready for Inspection |
IVRS - Inspection :* |
| 12/07/2004 |
PLUMBING - ROUGH, SOIL |
|
Not ready for Inspection |
IVRS - Inspection :* |
| 12/06/2004 |
PLUMBING - ROUGH, SOIL |
|
Not ready for Inspection |
IVRS - Inspection :*/WHERE A VENT CONNECTS TO A HORIZONTAL DRAIN IT SHALL HAVE IT SINVERT TAKEN OFF ABOVE THE DRAINAGE CENTERLINE, DOWN STREAM OF THE TRAP BEING SERVED. 2)NOT INSTALLED PER PLAN. UNDERGROUND INCOMPLETE. NOT TEST |