Inspection History Details
Inspection Status: Denied
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/04/2005 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* PROVIDE REVISION FOR MAIN SEWER RELOCATION 2090-CLEAN UP ELECTRICAL AT ROOF TOP UNIT |
|
| 08/02/2005 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* AFTER HOURS INSPECTION PER S. LONG 1) PROVIDE ACCESS TO ROOF 2) A/C NOT CONNECTED |
|
| 08/02/2005 | BUILDING - FINAL | Denied | AFTER HOURS INSPECTION PER S. LONG: 1) EXTEND A/C CONDENSATE LINE TO ROOF EDGE 2) CLEAN UP ELECTRICAL AT ROOF TOP BY A/C UNIT 3) OPEN NEUTRAL GFCI SERVICE ON ROOF TOP |
|
| 07/31/2005 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) COMPLETE GRADING 2) LOWER CLEANOUTS TO GRADE 3) EXPOSE HCS AND YARD WATER LINE 4) SECURE EXTERIOR GAS LINE 5) LABEL SUB-PANEL NON-METALIC PLUMBING 6) ANTI-SIPHON ALL HOSE BIBS 7) EMERGENCY BARS AT BEDROOM WINDOWS MUST RELEASE OR BE REMOVEABLE 8) COMPLETE EXISTING BATHTUB WALLS 9) CAULK WATER CLOSETS BASE 10) SECURE DISHWASHER DRAIN LOOSE TO HIGHEST POINT 11) HEAT PUMP GAS NOT CONNECTED 12) ROOF COAT 13) EXPOSE LINES FOR YARD WATER AND HCS |
|
| 07/29/2005 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) CANCELLED PER PAPERWORK TURNED IN BY INSPECTOR R. FREIDINGER 2) ALL PIPING OK EXCEPT ABS TO PVC CONNECT AT HOUSE USE GREEN GLUE |