Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/14/2005 | ENGINEERING - FINAL | Approved | C OF O APPROVED. | |
| 12/28/2004 | ENGINEERING - FINAL | Partial Approval | CORRECTIONS REQUIRED: 1) CLEAN AND REMOVE ALL TRASH AND LOOSE SEDIMENT @ LOADING DOCK. PROVIDE SUMP PUMP OPERATION FOR LOADING DOCK AREA. 2) STABILIZE PLANTERS LOCATED AT THE NORTHERN PARIMETER NEXT TO 18TH ST. |