Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ABOVE CEILING
Permit Number - T04CM04570
Inspection Description - PLUMBING - ABOVE CEILING
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/12/2005 | PLUMBING - ABOVE CEILING | Approved | IVRS - Inspection :* 1) PLUMBING ABOVE 4TH FLOOR OK 2) OK TO COVER |
|
11/23/2004 | PLUMBING - ABOVE CEILING | Not ready for Inspection | IVRS - Inspection :*/1)THERE ARE TWO 6" CI STACKS IN CHASE. INSPECTOR NEEDS VERIFICATION THAT 2" IS CONNECTED TO WASTE STACK AND NOT VENT STACK 2)ALL HOT WATER TO BE INSULATED 3)HANGERS REQ'D AT EACH CHANGE OF DIRECTION OR ELEVATION AND AT THE END OF BRANCHES | |
10/25/2004 | PLUMBING - ABOVE CEILING | Not ready for Inspection | IVRS - Inspection :* |