Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/21/2005 | FRAMING | Approved | IVRS - Inspection :* | |
| 03/10/2005 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) ADD OPEN B VENT FLU AT FURNACE 2) CUT PLYWOOD 1" AWAY FROM FLU AT ROOF |
|
| 03/08/2005 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) BANG PLATE WIRES WHERE NEEDED AND GAS LINE 2) TAPE FLUE JOINTS 3) GROUND ALL METAL BOXES 4) REMOVE CLAMPS FROM YELLOW GAS LINE AND KEEP AWAY FROM ROOF 5) FINISH FLU INSTALLATION 6) REMOVE MID-BEARING CLAMPS FROM TRUSSES AND BLOCK BETWEEN THEM 7) REMOVE INSULATION 8) NEED DWV TEST ON PLUMBING 9) GROUT TUB 10) FIRE CAULK TOP PLATES |