Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T04CM04561
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/01/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
08/31/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 9:30 AM - STILL WORKING ON WH CORRECTIONS - SEVERAL CLEAN OUTS NOT COMPLETE - HB MISSING HANDLE AND NOT SECURE - FP MISSING LOG VALVE TRIM |
|
08/30/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* SOUTH HALF OF PROJECT INSPECTED UNITS 100-118 AND 200-220 OK EXCEPT #106 - CRACKED FITTING ON T&P #120 - T&P BLOCKED, INSTALL PROPER CO PLUGS #119 - DRIP ON T&P INSTALL PROPER CO PLUGS WH AT LAUNDRY - FLEX IS UNDERSIZED, GAS PIPING NEEDS SUPPORT. - EXP. TANK NOT ADEQUATELY SUPPORTED - ON WATER PIPING USE CORRECT SIZE & TYPE OF SUPPORTS - PVC PIPING NOT CORRECTLY INSTALLED. PVC IS TO BE PRIMED BEFORE SOLVENT CEMENTING. - EXPOSE CLEANOUTS AT MS & LAUNDRY - PROTECT ALL EXTERIOR PLASTIC FITTINGS W/LATEX PAINT |
|
08/29/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* - HBS VAC BREAKERS AND PACKINGS ARE LEAKING - REPAIR ON SEWER LINE IN PROGRESS - CHINA BOWL CAPS MISSING - UNABLE TO INSPECT LAUNDRY WH BECAUSE OF FRESH CONCRETE - SEE NOTES FROM 8/23 AND 8/15 REGARDING WH - CLEANOUT MISSING IN MULTI-PURPOSE RM. ALSO PERM CAP PIPING NOT USED. |
|
08/25/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* COMPLETE ALL PLUMBING FIXTURES HAVE A CONTACT PERSON ON SITE OR LEAVE A MESSAGE PHONE # |
|
08/23/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* - NOT A COMPLETE PUNCH LIST - PLUMBING FIXTURES INSTALLED IN MOST AREAS. MANAGERS ROOM AND KITCHEN AREA NOT READY. - CORRECT ICE MAKER BOX IN KIT. AREA - SUPPORT EXP. TANK AND PIPING AT LAUNDRY WH - PROVIDE SPECS FOR DIRECT VENT WH. SOLVENT WELD PVC JOINTS REQUIRE THE USE OF PVC PRIMER. - SUPPORT CPVC T&P PIPING AT WHS THAT HAVE PIPING LOCATED IN AREAS THAT COULD BE DAMAGED. - T&P TERMINATION AT MOP SINK REQUIRES AN AIR GAP - TRIM OUT ALL CLEANOUTS. C/O PLUGS SHALL BE MADE WATER AND GAS TIGHT BY THE USE OF APPROVED THREAD SEALANTS. - TUBULAR BRASS TRAPS NOT ALLOWED ON URINALS. |