Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T04CM04561


Addresses:

370 N PANTANO RD


Inspection Status: Approved

Inspection History: ELECTRIC - ABOVE CEILING

Permit Number - T04CM04561

Inspection Description - ELECTRIC - ABOVE CEILING

Inspection Status - Approved

Date Description Inspector Results Comments
09/18/2006 ELECTRIC - ABOVE CEILING Approved IVRS - Inspection :*
09/08/2006 ELECTRIC - ABOVE CEILING Partial Approval IVRS - Inspection :*
09/06/2006 ELECTRIC - ABOVE CEILING Not ready for Inspection IVRS - Inspection :*
09/05/2006 ELECTRIC - ABOVE CEILING Partial Approval IVRS - Inspection :*
OK PVC CONDUIT POLE IN POLE IN FRONT
OK CORRIDOR AND REC CENTER SOUTH ABOVE CEIL
OK TMPP MANAGERS UNIT
09/01/2006 ELECTRIC - ABOVE CEILING Not ready for Inspection IVRS - Inspection :*
OK PVC POLE TO POLE EAST/FRONT - FINISH AT REC CENTER & IN FRONT OF MANUAL QUARTERS.
1. FIXTURES TO BE ATTACHED TO GRID 410.16 IF MFG CLIPS USED THEY MUST BE EFFECTIVE.
08/31/2006 ELECTRIC - ABOVE CEILING Partial Approval IVRS - Inspection :*
OK TO TILE
LOBBY & CORRIDOR NORTH
OK PVC POLES SOUTH
08/29/2006 ELECTRIC - ABOVE CEILING Partial Approval IVRS - Inspection :*
08/28/2006 ELECTRIC - ABOVE CEILING Partial Approval IVRS - Inspection :*
OK TO REENERGIZE "MPA, MPB, MPC"
OK SOUTH & EAST BUILDING ABOVE CEILING HALLWAYS
08/25/2006 ELECTRIC - ABOVE CEILING Partial Approval IVRS - Inspection :*
08/22/2006 ELECTRIC - ABOVE CEILING Not ready for Inspection IVRS - Inspection :*
07/05/2006 ELECTRIC - ABOVE CEILING Partial Approval IVRS - Inspection :*
OK CANS SOFFIT MAIN ROOM
REC CENTER
SUPPORT VDV CABELING
06/26/2006 ELECTRIC - ABOVE CEILING Partial Approval IVRS - Inspection :*
1) OK 2 CORRIDOR TO COMM BLDG
06/23/2006 ELECTRIC - ABOVE CEILING Partial Approval IVRS - Inspection :*
OK CANS ON PORCHES COMMUNITY BUILDING.
1. SUPPORT VDV CABELING CORRIDORS AND IN BLDG.
04/03/2006 ELECTRIC - ABOVE CEILING Not ready for Inspection IVRS - Inspection :*
MEET WITH CONTRACTOR TO ANSWER QUESTIONS.
03/22/2006 ELECTRIC - ABOVE CEILING Partial Approval IVRS - Inspection :*
1. SECURE SE CABLE PVC CONDUITS
2. BUILDING INSPECTOR TO CHECK FIRE PENETRATIONS
3. PROVIDE MANUFACTURERS GROUND CLIP FOR BOXES
4. INSTALL VDV CABLING TO INSPECT
OK 1ST LID 1ST & 2ND FLOORS NORTH BUILDING.
03/16/2006 ELECTRIC - ABOVE CEILING Partial Approval IVRS - Inspection :*
OK 2-2" PVC FROM 400A EAST BLDG TO "HPB"
OK NM CABLE & BOXES SOUTH & EAST BUILDING CEILINGS
1. BUILDING INSPECTOR TO CHECK FIRE PENETRATIONS
2. PROVIDE GROUND FOR BOX FROM MANUFACTURER
3. INSTALL VDV CABELING TO INSPECT 725.6 & 800.6 & 760.6
4. SECONDARY RUN TO TRANSFORMERS TO BE IN A LISTED RACEWAY AND EXPOSED FOR INSPECTION
02/22/2006 ELECTRIC - ABOVE CEILING Partial Approval IVRS - Inspection :*SOUTH & EAST BUILDING 1ST FLOOR HAL CORRIDOR OK FOR 1ST LAYER OR DRYWAL