Inspection History Details
Permit: T04CM04561
Inspection Status: Approved
Inspection History: EXT METAL CLIPS/EXT SHEATHING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/23/2006 | EXT METAL CLIPS/EXT SHEATHING | Approved | IVRS - Inspection :* | |
| 04/28/2006 | EXT METAL CLIPS/EXT SHEATHING | Not ready for Inspection | IVRS - Inspection :* | |
| 04/19/2006 | EXT METAL CLIPS/EXT SHEATHING | Partial Approval | IVRS - Inspection :* SHEAR WALLS THROUGHOUT EXTERIOR |
|
| 03/20/2006 | EXT METAL CLIPS/EXT SHEATHING | Partial Approval | IVRS - Inspection :* NORTH BUILDING (2ND FLOOR) |
|
| 03/16/2006 | EXT METAL CLIPS/EXT SHEATHING | Partial Approval | IVRS - Inspection :* SOUTH & EAST BUILDINGS (2ND FLOOR) |
|
| 03/13/2006 | EXT METAL CLIPS/EXT SHEATHING | Partial Approval | IVRS - Inspection :* 1) NORTH AND EAST BLDGS OK AT 1ST FLOOR |
|
| 03/09/2006 | EXT METAL CLIPS/EXT SHEATHING | Partial Approval | IVRS - Inspection :* NORTH & EAST BUILDINGS (1ST FLOOR - EXT. SHEATHING & H.3.3'S) 1. NEED H.D.'S FULLY NAILED & ALL TO O.5.B SHEATHING/STUD 2. WILL VERIFY H.D.2 HOLDOWNS (EPOXIED) @ FRAMING INSPECTION. |
|
| 02/21/2006 | EXT METAL CLIPS/EXT SHEATHING | Partial Approval | IVRS - Inspection :* S. BUILDING EXT. SHEATING OK @ 1ST FLOOR, NEED TO CHECK ALL CLIPS |
|
| 02/02/2006 | EXT METAL CLIPS/EXT SHEATHING | Partial Approval | IVRS - Inspection :* SOUTH BUILDING, UNITS #101-104 (FIRST FLOOR) |
|
| 12/20/2005 | EXT METAL CLIPS/EXT SHEATHING | Partial Approval | IVRS - Inspection :*AT ELECTRICAL PANEL BETWEEN S & E BUILDING & N. & E. BUILDING |