Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROOF DRAINS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/09/2005 | PLUMBING - ROOF DRAINS | Approved | IVRS - Inspection :* 1) CORRECTIONS MADE OK, OK TO COVER ALL ROOF DRAINS | |
| 05/05/2005 | PLUMBING - ROOF DRAINS | Denied | IVRS - Inspection : See detailed listing on site.| 999*1) SHALL PROVIDE A CLEAN OUT ON ALL HORIZONTAL CHANGE OF DIRECTION THAT EXCEEDS 135 DEGREE. 2) RE TEST THE SYSTEM. |
|
| 04/19/2005 | PLUMBING - ROOF DRAINS | Partial Approval | IVRS - Inspection :* 1) SOIL WATER TEST IS OK FOR 4-6" RNL IN WINDOW FEATURES ONLY STUBBED INTO BLDG ONLY . OK TO COVER. |