Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/31/2007 | ENGINEERING - FINAL | Approved | Contractor addressed punch list. | |
| 10/16/2007 | ENGINEERING - FINAL | Cancelled | Need: 1- Truncated domes. 2- Fill bollards with concrete in trash enclosure. 3- Provide pilot holes for doors on trash enclosure. 4- Stripe parking area per approved plans. 5- Pin down all wheel stops. 6- See LeeRay regards to H.C. parking. (grade) |
|
| 04/03/2007 | ENGINEERING - FINAL | Denied | Contractor needs to complete all work per the approved site plan. |