Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T04CM04515
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/09/2006 | ENGINEERING - FINAL | Approved | PER INSP COPY | |
06/09/2006 | ENGINEERING - FINAL | Approved | ||
05/10/2006 | ENGINEERING - FINAL | Correction Required | 1.RE-PLUMB OR DAYLIGHT RAINWATER LEADER THAT TERMINATED AT INVERT OF R/D BASIN. 2. PROVIDE ROCK RIP RAP ON FILTER FABRIC AT ROOF DRAIN OUTLETS. 3. PROVIDE DECORATIVE PEDESTRIAN WALKWAY BETWEEN BJ'S AND JAREDS PER THE DEVELOPMENT PLAN. 4. PROVIDE REVISED AND C.O.T. APPROVED SITE PLAN, DEVELOPMENT PLAN AND GRADING PLAN FOR ALL REVISIONS AND MODIFICATIONS. |
|
09/28/2005 | ENGINEERING - FINAL | Correction Required | CONTACTS: DEYO SWARTZ II/ BJ'S GENERAL MGR - 690-1900 MEL/ BJ'S REGIONAL DIRECTOR - 714-376-3772 1. CLEAN-UP GREAS AND OIL SPILLAGE AT THE REAR ENTRY DOOR AND THE TRASH ENCLOSURE AREAS. 2. DIS-CONTINUE WASH DOWN OPERATIONS THAT DISCHARGE WASTEWATER TO THE PARKING LOT AND STORMWATER RETENTION/DETENTION FACILITIES. 3. IDENTIFY AN OPERATIONAL PLAN TO CONTROL SPILLAGE AND KEEP THESE AREAS CLEAN. NON COMPLIANCE WILL RESULT IN REFERRAL TO ADEQ AND PDEQ. |
|
06/03/2005 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O AT THIS TIME SEE PREVIOUS COMMENTS FOR ALL REMAINING ITEMS | |
05/25/2005 | ENGINEERING - FINAL | Not ready for Inspection | 1. COMPLETE ALL SITE WORK ON LOT #4. 2. DIRECT ALL ROOF DRAINAGE BELOW SIDEWALK SURFACES. 3. COMPLETE CONSTRUCTION OF RETENTION BASIN #7, THE 27' CURB OPENING WITH SPILLWAY, AND THE OUTLET WEIR WITH 26' SCUPPER. 4. PROVIDE REVISED AND C.O.T. APPROVED SITE PLAN, DEVELOPMENT PLAN AND GRADING PLAN FOR ALL REVISIONS AND MODIFICATIONS. 5. PROVIDE 24' PAAL AND 18' PARKING SPACES EAST OF BLDG. |
|
05/24/2005 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O FOR STOCKING PURPOSES ONLY |