Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 04/04/2005 |
PLUMBING - ROUGH, SOIL |
|
Approved |
APPROVED 3/16/04 ADDRESS CORRECTION POSTED ON SITE |
| 01/12/2005 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection :* WATER TEST WASTE & VENT UNDERGROUND ONLY OK. 1) WRAP PIPING AT PENETRATIONS POINT FOR CONTACT WITH CONCRETE. 2) PROVIDE FROM CAPS AT ALL DMEO PLUMBING PIPE LOCATIONS. 3) INSTALL CLEANOUTS FOR YOUR ISOMETRIC DRAWING. HAVE INSPECTED PRIOR TO CONCRETE POUR BACK. HAVE CORRECT ADDRESS & UNIT # ON YOUR PERMIT FOR FUTURE INSPECTIONS. |