Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 10/21/2004 |
PLUMBING - ROUGH, SOIL |
|
Approved |
IVRS - Inspection :*/ 1) ABS DWV THRU ROOF OK 2) COPPER OK 3) OK TO COVER ALL AREAS 4) WILL CHECK HANGERS ON ABOVE CEILING INSPECTION |
| 10/15/2004 |
PLUMBING - ROUGH, SOIL |
|
Not ready for Inspection |
IVRS - Inspection :*/THE JOB SITE NEEDS TO BE OPEN FOR INSPECTOR. I DON'T ALWAYS HAVE TIME TO WAIT. 2)ALL ABS FITTINGS THAT HAVE RECTOR SEAL #5 WILL BE THOURGHLY CLEANED AND REPLACED 3)N/H BANDS NOT APPROVED FOR ABS 4)HORIZONTAL X HORIZONTAL CHANGE OF DIRECTION TO BE A SWEEP. 5)ALL OVERHEAD PIPING TO BE SUPPORTED TO TABLE 3-1 94UPC 6)WATER HEATER NOT INSTALLED PER PLAN 7)INSPECTION STOPPED |
| 10/13/2004 |
PLUMBING - ROUGH, SOIL |
|
Not ready for Inspection |
IVRS - Inspection :* |